
PI to SAP Integration
PI to SAP integration was required by Contact Energy, New Zealand’s electricity generator. This case study outlines how CMMS data was sent from PI to SAP.
CASE STUDIES
PI to SAP integration was required by Contact Energy, New Zealand’s electricity generator. This case study outlines how CMMS data was sent from PI to SAP.
A gold mine required improved correlation of process data versus official lab data.
In this case study, we explore an electricity distribution company that had data validation problems causing issues with subsequent reporting.
Vector Gas, Auckland’s gas and electricity distributor, needed to better manage its transmission and wholesale gas metering data.
This case study outlines Transpower’s need to acquire quick, accurate, fault location data for their 11,803 km of high voltage lines.